
Pipeline Mainline ROW — Multi-mile
Multi-mile pipeline corridor cleared and daylit on the GC's schedule with daily linear-foot reporting and permit-condition restoration on closeout.
Pipeline mainline, transmission corridor, highway right-of-way, energy development. Fourth Generation Loggers. Highly skilled operators. 25 years cutting for major utilities and pipeline GCs · zero reportable incidents in 24 months.
Safety first. Production right behind it. A production-felling fleet and decades-deep operators clearing pipeline, transmission, highway, and energy-development corridors east of the Colorado River.
The schedule holds, the safety record holds, the corridor opens. That's been the posture for 25 years — OSHA 30 + SAFER on every site, energized-line clearance protocols honored, $5M GL over every project. The Indiana shop carries the largest barsaw in the country plus a TimberPro feller buncher, a Tigercat skidder, and track mulchers. End markets: midstream operators, IOUs, rural co-ops, DOTs, energy-development GCs, veneer mills, and stave operators.
Linear footage and acreage cut in the past 12 months. Verified, not aspirational.

Multi-mile pipeline corridor cleared and daylit on the GC's schedule with daily linear-foot reporting and permit-condition restoration on closeout.

Greenfield transmission corridor cleared, structures pads built, and access road graded for the utility's contractor in steep Appalachian terrain.

Annual vegetation-management cycle for an investor-owned utility on 18 miles of distribution ROW. Crews coordinated with energized-line clearance protocols.

Greenfield compressor station — clear, grub, and rough-grade for the civil contractor. Coordinated with NRCS-aligned erosion control.

Park County, Indiana select cut — 1,100 hard maple stems graded for veneer at the landing, hauled mill-direct.